All panels complete

image

A quick half hour sanding all the panel edges and I am ready to join the planks. Not bad six and a half hours work which even at twenty pound an hour is cheaper that the £150 I was quoted for CNC.

Don’t look much like a canoe but very happy with the results so far.

Build time so far 6.5 hours.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s