Sanded and and scrubbed all the fillets and laminated the carbon onto the bottom. Also added 75mm glass tape around all the sides of the carbon and 50 / 75 on the remaining keel areas. Used peel ply and small area 60mm x 40 not fully wet out and other areas may have had too much. Was a bit shocked when it weighted in at 12 kg, zeroed the scales and truth 7.5kg
Build time total 40 hours
Epoxy total 1100ml, (appox as working fast with bigger than usual volumes)